New Frontiers 5 mission selction |
New Frontiers 5 mission selction |
Jan 10 2023, 10:27 PM
Post
#1
|
|
Member Group: Members Posts: 718 Joined: 22-April 05 Member No.: 351 |
Full draft NF5 AO is now available:
https://go.nasa.gov/NF5DraftAO" target="_blank"> https://go.nasa.gov/NF5DraftAO Interestingly, there's an incentive to collaborate on proposals (and the selected mission) with ESA: "NASA and the European Space Agency (ESA) have formalized a partnership for the NF5 mission that provides an optional contribution(s). The contribution(s) may include hardware procured by ESA from European vendors and/or other services, such as ground segment support, to be considered under ESA responsibility." In the ESA system, instruments are paid for by the individual nations; presumably ESA is offering to collaborate under the assumption that there also would be instrument(s) from European nations. Other key points: Proposals prepared in response to this AO must describe an investigation that addresses at least one out of any of the six mission themes described below. These themes, listed without priority, are: • Comet Surface Sample Return • Io Observer • Lunar Geophysical Network • Lunar South Pole-Aitken Basin Sample Return • Ocean Worlds (only Enceladus), and • Saturn Probe. The following schedule describes the planned major milestones for this AO: AO Release Date ...........................................November 2023 (target) Preproposal Conference .........................................................AO Release + ~3 weeks (target) Mandatory Notice of Intent to Propose Deadline at 11:59 p.m. Eastern Time ....................................................AO Release + 4-6 weeks (target) Electronic Proposal Submittal Deadline at 11:59 p.m. Eastern Time ....................................................April 2024 (target) Letters of Commitment Due (with Proposal).........................April 2024 (target) Deadline for Augmented Submission via the NASA Box service at 4:30 p.m. Eastern Time ......................................................April 2024 (target) Step-1 Selections Announced (target) ...................................December 2024 (target) Initiate Phase A Concept Studies (target) ..............................January 2025 (target) Phase A Concept Study Reports Due (target) ........................January 2026 (target) Down-selection of Investigation for Flight (target) ...............…October 2026 AO-Required Launch Readiness Date ...................................January 1, 2031, to December 31, 2034 -------------------- |
|
|
Lo-Fi Version | Time is now: 1st November 2024 - 12:36 AM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |