MSL schedule delay? |
MSL schedule delay? |
Sep 9 2008, 08:10 PM
Post
#1
|
|
Member Group: Members Posts: 706 Joined: 22-April 05 Member No.: 351 |
The most recent Aviation Week and Space Technology (9/8) has the following tidbit in a piece on NASA schedule delays:
"On the robotoic front, the testing schedule for a critical instrument for the Mars Science Laboratory -- dubbed SAM for Sample Analysis at Mars -- may delay launch of the advanced rover from its 2009 planetary window into 2011." -------------------- |
|
|
Oct 4 2008, 06:06 PM
Post
#2
|
|
Senior Member Group: Admin Posts: 4763 Joined: 15-March 05 From: Glendale, AZ Member No.: 197 |
We are starting to tread into that circular discussion that Doug has asked us to get away from. This topic is about MSL and its timetable and future prospects.
-------------------- If Occam had heard my theory, things would be very different now.
|
|
|
Lo-Fi Version | Time is now: 3rd June 2024 - 05:58 AM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |