Falcon 9 Launch & Recovery Operations |
Falcon 9 Launch & Recovery Operations |
Jun 3 2008, 04:20 PM
Post
#1
|
|
Senior Member Group: Members Posts: 1018 Joined: 29-November 05 From: Seattle, WA, USA Member No.: 590 |
SpaceX just sent a press release with an update on the Falcon 9. They successfully did a 5-engine test. They also mentioned the next Falcon 1 attempt will be late June "or July," presumably meaning "late June or early July," but you never know. :-)
Here's the full text. This isn't on their web page yet, the last I looked: McGregor TX – Space Exploration Technologies Corp. (SpaceX) conducted the first five-engine firing of its Falcon 9 medium to heavy lift rocket at its Texas Test Facility outside McGregor on Thursday, May 29. At full power the engines generated almost half a million pounds of force, and consumed 1,750 lbs of fuel and liquid oxygen per second. This five engine test again sets the record as the most powerful test yet on the towering 235-foot tall test stand. The test of the five Merlin 1C engines, arranged in a cross pattern like the Saturn V moon rocket, is the last step before firing the full complement of nine engines, scheduled for this summer. With all engines operating, the Falcon 9 generates over one million pounds of thrust in vacuum - four times the maximum thrust of a 747 aircraft. “This is the first time that we’ve added more than one engine at a time, and all phases of integration and testing went smoothly,” said Tom Mueller, Vice President of Propulsion for SpaceX. “As with previous tests, we saw no unexpected interactions between the engines, and are on schedule for adding four more engines.” The first Falcon 9 will arrive at the SpaceX launch site at Cape Canaveral by the end of 2008. The next flight of SpaceX’s smaller Falcon 1 rocket is scheduled for late June or July of 2008. |
|
|
Dec 24 2008, 01:47 AM
Post
#2
|
|
Member Group: Members Posts: 104 Joined: 1-June 08 Member No.: 4172 |
Apparently SpaceX has won 1.6 billion dollars in firm NASA contracts and beaten out Orbital to become the ISS Commercial Orbital Transportation Services provider. If the Falcon 9 missions are really priced at about 50 million, that means 32 missions, which would be a great start for a new and potentially planetary mission class launch vehicle.
|
|
|
Dec 24 2008, 02:39 AM
Post
#3
|
|
Member Group: Members Posts: 213 Joined: 21-January 07 From: Wigan, England Member No.: 1638 |
Apparently SpaceX has won 1.6 billion dollars in firm NASA contracts and beaten out Orbital to become the ISS Commercial Orbital Transportation Services provider. Not quite -- NASA has awarded two contracts: to Orbital (8 flights) and SpaceX (12 flights). |
|
|
Lo-Fi Version | Time is now: 31st October 2024 - 11:07 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |