Nozomi in perspective, Revisiting the causes of failure |
Nozomi in perspective, Revisiting the causes of failure |
Oct 23 2011, 09:12 AM
Post
#1
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
http://www.mext.go.jp/b_menu/shingi/uchuu/...ts/04061101.pdf
Above pdf file will be translated for aspiring students in aeronautics, control engineering etc. so that in future lay people like me will be able to enjoy planetary scenes and events without worrying about failures. The overall title is "Looking into the causes of failure and trying to find the right measures to take for the future with respect to the 18th scientific satellite (PLANET-B ) not inserted into Mars orbit as planned" and it is dated 21 May 2004. This file is very much detailed at 1.1 megabytes and the number of pages is about 40, I think. In addition, I will be translating 3 more files after this particular file. They will be; 1. ISAS file with views and comments on the failure 2. Another ISAS file, a newsletter written out in a series of 4 individual letters. 3. JAXA file, which is a press release and it is a very concise document with just sufficient details. Re concise link making I tried a few times, but I simply failed and all the links will be fully pasted out as required. Pandaneko |
|
|
Oct 24 2011, 09:37 AM
Post
#2
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
above for ease of reference (list of contents is as follows) Preliminary・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・1 Ⅰ.Outline of Nozomi 1.Outline of the satellite・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・2 (1) Objectives of Nozomi・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・2 (2) Outline of the satellite・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・2 (3) Instruments on Nozomi and the outline of the knowledge obtained by the time orbit insertion was abandoned・・・・2 2.History of development and its background・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・2 (1) History of Nozomi development・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・3 (2) Science targets of Nozomi・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・3 (3) Nozomi development philosophy・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・4 (4) Nozomi design philosophy・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・5 (5) Lighter Nozomi due to launch postponement・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・6 3.Outline of the history leading up to abandonment of orbit insertion・・・・・・・・・・・・・・・・・・・・6 (1) Occurrence of fuel system failure (20 October 1999)・・・・・・・・・・・・・・・・・・・・・・6 (2) Occurrence of coms. and thermal control system faillure (25 April 2002)・・・・・・・・・・・・・・・・・・・・7 (3) Operation for fault recovery・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・7 (4) Abandonment of orbit insertion (9 December 2003)・・・・・・・・・・・・・・・・・・・・・・・・・・7 Ⅱ.Looking into the causes of fuel supply system mulfunction 1.Circumstances of mulfunctioning・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・8 (1) Outline of propulsion system・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・8 (2) About the operation for Mars transfer orbit insertion・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・8 (3) Grasping the telemetric data and analysis・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・9 (4) Operation after telemetry and status of LV2・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・10 2.History of selecting LV2 valve for Nozomi・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・11 (1) History of LV2 valve selection・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・11 (2) Inspection contents of LV2・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・13 3.Estimated causes of the mulfunction・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・15 (1) Fault tree analysis (FTA)・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・15 -ⅰ- (2 Candidates for faults・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・15 (3) Estimated causes of the mulfunction・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・17 Ⅲ.About the mulfunctions in the coms and thermal control systems 1.Circumstance of these occurrences・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・18 (1) Outline of the power system・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・18 (2) About the operation between the times of contact loss prior to the mulfunction and mulfunction day・・・・・・・・・・・・・・・・・18 (3) Space environment on the day of mulfunction development・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・19 (4) "1 bit coms" and grasping of the probe status by autonomous function・・・・・・・・・・・・・・・・・・・・・・・・・19 (5) Grasping the status thanks to the operational recovery after fault development・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・20 2.Estimating the causes・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・22 (1) Fault tree analysis (FTA)・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・22 (2) Causes of the short circuiting・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・23 (3) Estimating the causes of mulfunctions・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・25 Ⅳ.For the future 1.For the future fuel supply systems・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・27 (1) Measures to be taken in valve selection・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・27 (2) Measures to be taken in satellite operation・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・28 2. Measures to be taken in coms. and thermal control systems・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・29 (1) Measures by seperating out the faults・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・29 (2) Development of parts which will not develop latch-ups・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・29 3.Reflecting into the design philosophy of future science satellites・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・30 (1) Design changes・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・30 (2) Ground tests・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・30 (3) Imported parts・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・31 (4) Fault seperation・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・31 (5) Software operation in contingencies・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・31 (6) Policy on future deep space missions・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・32 Ⅴ.graphics and charts and tables・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・34 ‐ⅱ‐ Ⅵ. Glossary and abbreviations・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・78 (reference 1) Finding the causes of the failure of Nozomi and future measues to be taken・・・・・・・・・・・・・・・・・・82 (reference 2) Members of SAC (I will not be translating this reference, P)・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・83 (reference 3) Schedule of the investigation meetings・・・・・・・・・・・・・・・・・・・・・ (end of the contents list page) P |
|
|
Lo-Fi Version | Time is now: 31st October 2024 - 11:00 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |