The manufacture of the JWST mirror blanks has now been completed.
Despite this milestone, the fate of JWST is still somewhat precarious, because although the scientific bang from the telescope is expected to be huge, the bucks required have increased to a staggering $4.5 billion. A Space.com article on the squeeze in NASA's space-based astronomy plans gives some background. The JWST home page can be found here. The Space Telescope Science Institute, which runs Hubble, also has a site here. As does ESA. |
|
|
Aug 23 2005, 02:42 PM
Post
#2
|
|
Member Group: Members Posts: 134 Joined: 13-March 05 Member No.: 191 |
Well, a 6.5m telescope is pretty big even on the ground. And the plan is to send it to L2, not LEO, so with no repair capability, it has to be REALLY well designed, with huge redundancy and margin etc. Plus, the thing weighs nearly seven tonnes.
A little more info at this New Scientist article. Back in 2003, it was projected to cost $2.5 billion. I'll see if I can find some more info on what is driving up the cost. |
|
|
Lo-Fi Version | Time is now: 1st November 2024 - 12:14 AM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |