Nozomi in perspective, Revisiting the causes of failure |
Nozomi in perspective, Revisiting the causes of failure |
Oct 23 2011, 09:12 AM
Post
#1
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
http://www.mext.go.jp/b_menu/shingi/uchuu/...ts/04061101.pdf
Above pdf file will be translated for aspiring students in aeronautics, control engineering etc. so that in future lay people like me will be able to enjoy planetary scenes and events without worrying about failures. The overall title is "Looking into the causes of failure and trying to find the right measures to take for the future with respect to the 18th scientific satellite (PLANET-B ) not inserted into Mars orbit as planned" and it is dated 21 May 2004. This file is very much detailed at 1.1 megabytes and the number of pages is about 40, I think. In addition, I will be translating 3 more files after this particular file. They will be; 1. ISAS file with views and comments on the failure 2. Another ISAS file, a newsletter written out in a series of 4 individual letters. 3. JAXA file, which is a press release and it is a very concise document with just sufficient details. Re concise link making I tried a few times, but I simply failed and all the links will be fully pasted out as required. Pandaneko |
|
|
Dec 24 2011, 10:19 AM
Post
#2
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
above for ease of reference page 75 Table IV-2-2 Means for seperating out failure causes and their characteristics (This is a C3R6 regular matrix inluding the headers in row 1) C1R1: Failure cause seperation means C2R1: Meritts C3R1: Demeritts C1R2: Resistances C1R3: Fuses C1R4: Relays and limtter circuits C1R5: FET switches and limitter circuits C1R6: Ideal redundancies C2R2: system is easy and repetitive activations are possible. C2R3: Setting up is easy. C2R4: Repetitive activations are possible. also, cancelling of latching up is possible. There is a possibility to save components from temporary shortciruiting. C2R5: Repetitive activation is possible. There is no limit to the number of activation. also, cancelling of latching up is possible. There is a possibility to save components from temporary shortciruiting. It is very easy to set the system to OFF side without fail at the time of power on. C2R6: It is possible to accept, at least once and perfectly as well, every possible failure mode. C3R2: Need heat resistance at times of short circuiting. Given voltage drop we may find it difficutlt to use this as "load current" may fluctuate. C3R3: Once activated it will remain in the same state forever. We need to check anti-vivration characteristics at launch times. Action possible region is generally fairly narrow in that it will function without being affected by a sudden surge etc, with a current which will not affect other devices. C3R4: Composition is very complex. Relaying system itself needs watching out for failures and there is a limitation on the number of possible actions that can be taken. If the relay system is of a "latch type" it may not improve the situation if: 1. there is another breaker downstream and 2. response speed upstream is slow C3R5: Composition is very complex. We need to allow for: 1. some extent of voltage drop 2. some extent of heat generation C3R6: Impact on heavy resources is largest (I have no idea what they are talking about, P) If we want to introduce cross-redundancies it will lead to the system getting very complicated and we will have to be extremely careful in design and verification. We will need to evaluate its usefulness against the failure rate of similar redundant systems if: 1. the vulnerability against failure is very localised and/or 2. if the failure rate in question is very low in the first place. end of page 75 P |
|
|
Jan 17 2012, 10:11 AM
Post
#3
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
What follows is the URL of the press release of JAXA on Nozomi's failure.
http://www.jaxa.jp/press/2003/12/20031210_nozomi_j.html About this coding business I have been thinking about it for the last three weeks. Simplest would be to experiment. Here, I will switch on my hardware switch to write "1 A" using 16 bits coding. What goes before that is "1 A" with 8 bits coding. 1. 1 A with 8 bits coding: 1 A 2. 1 A with 16 bits coding: 1 A With 2. above, I actually added one space with 16 bits coding and that may complicate this issue, but not by much, I hope... If you can read them both without any problems, then I can forget about my worries about this, except that there might still be cases where the person(s) who wrote the whole thing may have used the mixture of 8 and 16 bits codings without consistency. This is not a small matter of concern. On placing mail orders, for example, your order may be rejected. It does happen, here, often... Pandanakeo |
|
|
Jan 19 2012, 08:28 AM
Post
#4
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
What follows is the URL of the ISAS pages I am about to ranslate for some time to come.
http://www.isas.jaxa.jp/j/enterp/missions/...status_01.shtml Its rough title is something like "what Nozomi may have left for the success of future international planetary missions". This is entirely in accordance with the purpose of my translating relevant files for the advancment of future missions and I am very pleased that I found this particular file for the communities with interest. Translations will follow shortly. The original file consists of 4 contributions made by the same person and each may take up to a few times of translation. I will not be identifying the name of the person who wrote these pages. P |
|
|
Jan 30 2012, 09:09 AM
Post
#5
|
|
Member Group: Members Posts: 817 Joined: 17-April 10 From: Kamakura, Japan Member No.: 5323 |
What follows is the URL of the ISAS pages I am about to ranslate for some time to come. http://www.isas.jaxa.jp/j/enterp/missions/...status_01.shtml Its rough title is something like "what Nozomi may have left for the success of future international planetary missions". What follows is a short paragraph immediately after the Phase change spectrum and immediately before the start of part 3 of this part 4 series. As I think of all those people all over the world who had sacrificed their lives and designed instruments on board which were never used despite being so close to the Mars I feel so frustrated and sad to the extent of feeling like crying. Nozomi had a formidable assembly of first rate magnetic and plasma observation means on board. Nozomi was to have played a significant auxilliary role side by side with European and US observers currently going there. My heart is bleeding for my colleagues. Towards the end of the operationn there came in a flood of mails and telephone calls from all over the world, all encouraging us for then and the future. Here, I only simply aplogize for the fact that we were not able to comply with their aspirations. Needless to say that our Nozomi team will never ever forget the fervent encouragement given to us by our colleagues and friends worldwide during the last minute death battle in December 2003. (This is the end of the part 3 of this part 4 series, P) |
|
|
Lo-Fi Version | Time is now: 31st October 2024 - 10:58 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |