IPB

Welcome Guest ( Log In | Register )

New Uranus mission proposal
antipode
post Dec 24 2013, 03:30 AM
Post #1


Member
***

Group: Members
Posts: 315
Joined: 1-October 06
Member No.: 1206



Here, in Icarus today...

http://arxiv.org/abs/1312.6554

Abstract
QUOTE
The solar wind electric sail is a novel propellantless space propulsion concept. According to numerical estimates, the electric sail can produce a large total impulse per propulsion system mass. Here we consider using a 0.5 N electric sail for boosting a 550 kg spacecraft to Uranus in less than 6 years. The spacecraft is a stack consisting of the electric sail module which is jettisoned at Saturn distance, a carrier module and a probe for Uranus atmospheric entry. The carrier module has a chemical propulsion ability for orbital corrections and it uses its antenna for picking up the probe's data transmission and later relaying it to Earth. The scientific output of the mission is similar to what the Galileo Probe did at Jupiter. Measurement of the chemical and isotope composition of the Uranian atmosphere can give key constraints for different formation theories of the solar system. A similar method could also be applied to other giant planets and Titan by using a fleet of more or less identical electric sail equipped probes.


P
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
katodomo
post Jul 22 2015, 09:55 PM
Post #2


Junior Member
**

Group: Members
Posts: 78
Joined: 20-September 14
Member No.: 7261



I seem to remember part of the issue/trade-off (and a easy decisive no) was the cost of keeping flight ops staff and DSN tracking time available to the mission for such a lengthy period.
Go to the top of the page
 
+Quote Post
stevesliva
post Jul 23 2015, 12:42 AM
Post #3


Senior Member
****

Group: Members
Posts: 1582
Joined: 14-October 05
From: Vermont
Member No.: 530



QUOTE (katodomo @ Jul 22 2015, 05:55 PM) *
I seem to remember part of the issue/trade-off (and a easy decisive no) was the cost of keeping flight ops staff and DSN tracking time available to the mission for such a lengthy period.


I seem to recall it was moot. Reserving propellant to escape Saturn sacrificed Saturn science in return for questionable flyby science.

"A bird in the hand is worth two in the bush."

That said, it was a really neat idea.
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic

 



RSS Lo-Fi Version Time is now: 1st May 2024 - 10:10 PM
RULES AND GUIDELINES
Please read the Forum Rules and Guidelines before posting.

IMAGE COPYRIGHT
Images posted on UnmannedSpaceflight.com may be copyrighted. Do not reproduce without permission. Read here for further information on space images and copyright.

OPINIONS AND MODERATION
Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators.
SUPPORT THE FORUM
Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member.