this was posted earlier today (without any link or other references) on the NASAspaceflight forum:

QUOTE
Akatsuki was complete the oxidizer dump operations in Oct. 6, 12, 13th (each 6 min. 9min. 9min).

Three RCS burns are planned in Nov. 1, 10, 21th.
First two burn duration is 600 sec, delta-V is 90 m/s.
Third burn duration will be adjusted based on necessary delta-V.
Go to the top of the page
 
+Quote Post
Paolo
post Oct 28 2011, 05:13 AM
Post #512


Senior Member
****

Group: Members
Posts: 1729
Joined: 3-August 06
From: 43° 35' 53" N 1° 26' 35" E
Member No.: 1004



a new pdf release by JAXA http://www.jaxa.jp/press/2011/10/20111026_sac_akatsuki.pdf
Go to the top of the page
 
+Quote Post
pandaneko
post Oct 28 2011, 10:30 AM
Post #513


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (Paolo @ Oct 28 2011, 02:13 PM) *



Thanks, Paolo

There is nothing we do not know on pages 1 to 3. These pages talk about history up until now. So, my translation starts with page 4 as follows.

page 4

3.Operation of oxidiser dumping

This was conducted on 6th, 12th, and 13th October 2011 for 6 minutes, 9 minutes, and 9 minutes respectively.

(There are two graphs here)

(with the graph on the left the vertical is temp and the horizontal is time in minute relative to the start of dumping of NTO)

(This graph is the temp history and)

red: fuel propellant valve temp
blue: oxidiser propellant valve temp
purple: oxidiser tank temp
green: injector temp

(with the graph on the right the vertical is acceleration in m/sxs and the horizontal is the measued value of acceleration)

(there are 4 zones from left to right and the are)

blue: test discharge (1 min)
red: 1st discharge (6 min)
green: 2nd discharge (9 min)
purple: 3rd discharge (9 min)

(top left character string says) : RCS settling (3 seconds)
(bottm righ string pointing to a sudden drop says) : end of discharge


Although power is supplied to the propellant valve on the fuel side while discharging operation is in progress there is no cooling by fuel available. Thus, it was feared that the temp of the fuel side propellant valve might exceed the allowed limit. Also, freezing of the OME injector was feared. However, we judged that discharging operation was feasible from the ground tests and analyses as long as we divide the operation into several times. It was confirmed that the discharging operation was completed at the 3rd time without exceeding the allowed temp limit.


The sudden drop in acceleration during the 3rd discharging operation indicatef that pressurising helium gas pushed through and discharging was complete as planned.

end of page 4 (and 2 more pages to go and they will follow tommorrow)

P
Go to the top of the page
 
+Quote Post
rlorenz
post Oct 28 2011, 11:19 PM
Post #514


Member
***

Group: Members
Posts: 609
Joined: 23-February 07
From: Occasionally in Columbia, MD
Member No.: 1764



QUOTE (pandaneko @ Oct 28 2011, 05:30 AM) *
The sudden drop in acceleration during the 3rd discharging operation indicatef that pressurising helium gas pushed through and discharging was complete as planned.


Thanks again for these ongoing posts.

I'm wondering if this is a spaceflight first (dumping oxidiser this way) ?
I could imagine it may be - these are rather unusual circumstances.

Go to the top of the page
 
+Quote Post
pandaneko
post Oct 29 2011, 10:25 AM
Post #515


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (Paolo @ Oct 28 2011, 02:13 PM) *


above for ease of reference

page 5

4.Considerations relating to orbit control by RCS


1. Maintaining the thermal balance in the thruster 's catalytic layers during the continuous firing

Main points of concern with the continuous firing of RCS and our current stance are as follows.

By adopting the orbit control attitude (+X pointing in the sun's direction) the +X side of the thruster will be in a thermally difficult state. However, analyses confirmed that the temp of the catalytic layers during the burn will be in an equiribruim state.



2. Temp rise of the propellant valve by the heat soakback (*) after the continuous firing

Although the temp of the thruster valve will increase by the heat soakback after the continuous firing it was confirmed that the rise will remain within the allowed temp range.

* This is a occurrence in which the temp of the propellant valve kept cooled by the supplied fuel will increase by the heat conducted from the hot burner after the continuous firing of the engine


3 Temp increase of various parts of the probe due to the attitude maintenance operation during the continuous firing

Orbit control attitude (+X sun pointing direction) will lead to temp increase in the various parts of the probe. However, we will change back to +Z sun pointing direction immediatelyy after the firing and it was confirmed that all parts of the probe will not exceed the allowed temp range.


Conclusion:

Based on the report of 30 September at the investigation meeting regarding the RCS continuous firing and records of similar burning in orbit by other satellites in addition to above further consideration as reported here we reached a conclusion that an orbit control firing by RCS will be conducted in November this year during a nearest sun approach.

end of page 5

P
Go to the top of the page
 
+Quote Post
pandaneko
post Oct 30 2011, 09:43 AM
Post #516


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (Paolo @ Oct 28 2011, 02:13 PM) *


above for ease of reference

page 6


5.Orbit control plan at the nearest sun (I know that there is a special term for this, but I keep forgetting it and I am more comfortable with nearest sun, P) point

(There is a schematic and I will translate the character strings on it later. Main texts first)

Orbit control by the RCS engines at the nearest sun approach point



(1st control on 1 November) ΔV : 90m/s

(2nd contorl on 10 November) ΔV : 90m/s
(3rd control on 21 November) ΔV : approx. 70m/s

We will carry out the 3rd control by taking into account the result of ultra accurate measurement of orbits effected by earlier two controls (thrust direction and magnitude will be dependent on the errors due to the first two controls).


※ These orbit changes are carried out in order to reunite with Venus after 2015.


※ There is a possibility that our orbit control plan may be altered depending on the assessment taking place from now on.

(the schematic title says): Relative positions between the probe, Venus and the earth at the time of Akatsuki orbital controls

(the unit, both vertical and horizontal, is 10 to the power of 8km)
(outer circle is earth, inner circle is Akatsuki and in between is the Venus orbit)

(2 characters around 9:00 are): top is Sept 2011 and bottom is test firing

(bottom character on Venus orbit is): Nov 2011

(on earth orbit at 1 O'clock is): Nov 2011 (and at around 3:00 on the same earth orbit is ): Sept 2011

(at around 4:30 on Akatsuki orbit is): nearesst sun orbit control

end of page 6

P


Go to the top of the page
 
+Quote Post
pandaneko
post Oct 31 2011, 10:01 AM
Post #517


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (Paolo @ Oct 28 2011, 02:13 PM) *


above for ease of reference

page 7

6.Summary of this report

1.Akatsuki's current health and operational plan from now

– All insturments on board are healthy and the satellite is circulating around the Sun

– From the in-orbit firing of the OME conducted in September this year (2011) we judged that OME will not be able to produce an effective propulsion required for further orbit controls and that any further orbit control will have to be achieved by the RCS engines

– Dumping of unrequired oxidiser was conducted in October this year in order to reduce the satellite mass and this operation was confirmed to be a success from telemetry data, all aprts of the satellite not exceeding the allowed limit in temp.

2. Nearest sun approach orbit control

– Orbit control by RCS engines is planned for November this year as the satellite makes a nearest approach to the Sun.

– We investigated the risks involved in the orbit control by RCS and it has been confirmed that there is a good scope for safe operation.

– Orbit control will be divided into three parts, each taking place on 1, 10, and 21 November and depending on our further consideration and the outcome of controls the orbit control plan may change.

end of page 7 and end of this particular report

P
Go to the top of the page
 
+Quote Post
Paolo
post Oct 31 2011, 10:18 AM
Post #518


Senior Member
****

Group: Members
Posts: 1729
Joined: 3-August 06
From: 43° 35' 53" N 1° 26' 35" E
Member No.: 1004



thanks Pandaneko, very informative, as always!
Go to the top of the page
 
+Quote Post
antipode
post Oct 31 2011, 10:24 AM
Post #519


Member
***

Group: Members
Posts: 314
Joined: 1-October 06
Member No.: 1206



If the Japanese pull this off it will be another 'snatching victory from the jaws of defeat' performance. They seem to do their best when their missions are in deep doodoo! smile.gif

P
Go to the top of the page
 
+Quote Post
pandaneko
post Nov 1 2011, 09:27 AM
Post #520


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



This morning I was surprised to find that there is to be a news coverage of Akatsuki during this evening's 7 O'clock TV news. It is only half an hour to go. This sort of coverage is very rare here. As far as I can recall about the only TV coverage for even Hayabusa was at the time of its disintegration...

So, I am intrigued.

P
Go to the top of the page
 
+Quote Post
pandaneko
post Nov 2 2011, 08:30 AM
Post #521


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (pandaneko @ Nov 1 2011, 06:27 PM) *
a news coverage of Akatsuki during this evening's 7 O'clock TV news.


I watched this TV news last night. A few things.

1. Although I am used to seeing graphs all neatly compiled for reports in the course of my translation this was the first time that I had seen a raw graphical output for Akatsuki. It was a horizontal line of about a foot in length and the delta V gain bit was a short (an inch or so) straight line at an angle, about 30 degrees, I would say. These magnitudes are judged relative to human size seen in the control room. It was pleaseing to see this output. It was like having a freshly baked bread right in front of me!

2. The intro said "a new (after the failure) period of a few days against the originally planned 30 hours circulation period" and at this point my brain went "???". I had all along viewed the current operation as a cosmetic excercise and in any event I was under the impression when I was translating for the new orbit that it was going to be anything from a few weeks to a few months.

As far as I am wishfully concerened "a few days" is 3 days and that is 72 hours. Does this not mean that I might be able to watch some lightenings as I had hoped to watch? I love lightenings, celestial or otherwise.

P
Go to the top of the page
 
+Quote Post
Paolo
post Nov 2 2011, 09:02 AM
Post #522


Senior Member
****

Group: Members
Posts: 1729
Joined: 3-August 06
From: 43° 35' 53" N 1° 26' 35" E
Member No.: 1004



here is a short release (in Japanese) on yesterday's burn
http://www.isas.jaxa.jp/j/topics/topics/2011/1101.shtml
Go to the top of the page
 
+Quote Post
pandaneko
post Nov 2 2011, 09:33 AM
Post #523


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



QUOTE (Paolo @ Nov 2 2011, 06:02 PM) *
here is a short release (in Japanese) on yesterday's burn
http://www.isas.jaxa.jp/j/topics/topics/2011/1101.shtml


Thanks, Paolo

The press release reads as follows.

"About the orbit control of Akatsuki during the nearest sun approach


1st of the orbit control by RCS was conducted for some 10 minutes from 13:22 on 1 November (JST). We will be analysing the telemetry data to reflect the finding with the 2nd orbit control firing planned for 10 November."


end of presss release

P
Go to the top of the page
 
+Quote Post
pandaneko
post Nov 9 2011, 09:51 AM
Post #524


Member
***

Group: Members
Posts: 817
Joined: 17-April 10
From: Kamakura, Japan
Member No.: 5323



I know that people will laugh at me for all sorts of reasons.

However, I will say this for record!

We should forget about dual liquid engines for orbital operation and instead use smaller single liquid attitude control engines for all orbital operations including orbit insertion.

Instead of having half a dozen smaller engines why not have a dozen of them? I have not heard of a single case of these attitude controlers going out of control. I am saying all this because of a simple fact that larger and more complex engines seem to fail without fail!

Pandaneko
Go to the top of the page
 
+Quote Post
rlorenz
post Nov 9 2011, 12:52 PM
Post #525


Member
***

Group: Members
Posts: 609
Joined: 23-February 07
From: Occasionally in Columbia, MD
Member No.: 1764



QUOTE (pandaneko @ Nov 9 2011, 04:51 AM) *
We should forget about dual liquid engines for orbital operation and instead use smaller single liquid attitude control engines for all orbital operations including orbit insertion.
Instead of having half a dozen smaller engines why not have a dozen of them? I have not heard of a single case of these attitude controlers going out of control. I am saying all this because of a simple fact that larger and more complex engines seem to fail without fail!


Well, this is exactly the trade that any system design has to make.... unfortunately such decisions have to be made on very
incomplete data : larger engines do not always fail, and small monopropellant thrusters are not immune to failure
either. Consider the following :
1. you'd need 20 (not an extra 6) small 20N thrusters to give you the thrust of the biprop engine. Even if the individual
failure rate of these engines is lower than the biprop, there are now 20 of them to go wrong (e.g. a valve stick 'on')
2. the specific impulse of the monoprop is less (and small thrusters are also less efficient than a large one). Via the
rocket equation, this can have a huge impact on the vehicle mass.
3. the root cause of the Akatsuki failure (viz poor helium flow through the check valve on the fuel-side pressurization)
might have caused enough underperfomance of a monopropellant system to prevent orbit insertion anyway.

So what you suggest makes sense, and engineers do it when they can get away without a big engine, but
missions typically demand the performance that only a biprop can give.
Go to the top of the page
 
+Quote Post

50 Pages V  « < 33 34 35 36 37 > » 
Reply to this topicStart new topic

 



RSS Lo-Fi Version Time is now: 28th March 2024 - 11:02 PM
RULES AND GUIDELINES
Please read the Forum Rules and Guidelines before posting.

IMAGE COPYRIGHT
Images posted on UnmannedSpaceflight.com may be copyrighted. Do not reproduce without permission. Read here for further information on space images and copyright.

OPINIONS AND MODERATION
Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators.
SUPPORT THE FORUM
Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member.