NASA’s VIPER, Volatiles Investigating Polar Exploration Rover |
NASA’s VIPER, Volatiles Investigating Polar Exploration Rover |
Oct 25 2019, 06:09 PM
Post
#1
|
||
Junior Member Group: Members Posts: 66 Joined: 3-August 12 Member No.: 6454 |
Exciting development.
But it looks like VIPER could end up like Philae - dead in the dark. https://www.nasa.gov/feature/new-viper-luna...ice-on-the-moon |
|
|
||
Oct 25 2019, 06:26 PM
Post
#2
|
|
Solar System Cartographer Group: Members Posts: 10256 Joined: 5-April 05 From: Canada Member No.: 227 |
This is essentially the same mission that was called Resource Prospector during its development. There are lots of interesting studies of traverse planning and very cool tools to help plan activities in areas of rapidly changing low angle illumination.
Phil -------------------- ... because the Solar System ain't gonna map itself.
Also to be found posting similar content on https://mastodon.social/@PhilStooke Maps for download (free PDF: https://upload.wikimedia.org/wikipedia/comm...Cartography.pdf NOTE: everything created by me which I post on UMSF is considered to be in the public domain (NOT CC, public domain) |
|
|
Oct 26 2019, 12:29 AM
Post
#3
|
|
Member Group: Members Posts: 718 Joined: 22-April 05 Member No.: 351 |
One of the goals for the mission, from a conference abstract I will try to look up later, is to develop technology that allows the rover to operate in darkness (and presumably the extreme cold the permanently shadowed craters) for long periods. This is presumably without an RTG, but it may carry many radioisotope heater units.
And color me skeptical on the launch date. I'd love to be proven wrong. -------------------- |
|
|
Oct 26 2019, 05:08 AM
Post
#4
|
|
Member Group: Members Posts: 718 Joined: 22-April 05 Member No.: 351 |
Here are two conference abstracts about VIPER and a quote from Space.com
AGU Fall 2019: P34B-03 - An Overview of the Volatiles Investigating Polar Exploration Rover (VIPER) Mission A critical goal to both science and exploration is to understand the form and location of lunar polar volatiles. The lateral and vertical distributions of these volatiles inform us of the processes that control the emplacement and retention of these volatiles, as well as helping to formulate in-situ resource utilization (ISRU) architectures. While significant progress has been made from orbital observations, measurements at a range of scales from centimeters to kilometers across the lunar surface are needed to generate adequate “volatile mineral models” for use in evaluating the resource potential of volatiles at the Moon. VIPER is a solar and battery powered rover mission designed to operate over multiple lunar days, traversing several kilometers as it continuously monitors for subsurface hydrogen and other surface volatiles. In specific thermal terrain types, including permanently shadowed terrain and locales that permit near-surface ice stability, subsurface samples will be examined for volatile content using a one-meter drill. This talk will provide an overview of the VIPER mission which is scheduled for flight to the Lunar South Pole in December 2022. Space,com https://www.space.com/viper-nasa-moon-rover.html"" target="_blank">Space.com VIPER VIPER would let engineers test technologies designed to let lunar rovers work through the night, but it wouldn't tackle those specific science measurements. Instead, according to Bailey's presentation last month, there are four primary instruments that NASA is eyeing for VIPER. Two of those instruments were under development for Resource Prospector; NASA also included both in a list of a dozen instruments selected in February to land on the moon as early as this year. (Bailey said they are scheduled to fly on board Astrobotic's lunar lander, which is due to fly in the summer of 2021.) Those projects are the Neutron Spectrometer System, which measures hydrogen in the lunar surface; and the Near-Infrared Volatile Spectrometer System, or NIRVSS, which can study volatile composition, mineralogy and surface temperature. A third instrument NASA is eyeing for VIPER is a drill designed to reach about 3 feet (1 meter) into the lunar regolith. LEAG 2019 The Near InfraRed Volatiles Spectrometer System (NIRVSS) [#5057] The Near InfraRed Volatiles Spectrometer System (NIRVSS) is an integrated set of sensors meant to identify volatiles, especially water, and characterize the scene environments relevant to volatile retention or form. NIRVSS consists of three main subsystems including 1) a Near InfraRed (NIR) point spectrometer and lamp that measures reflectance between 1300 to 4000 nm with a spectral resolution ranging from about 15Nm to 30nm, 2) a 4 Mpxl Science Context Imager, integrated with seven sets of LEDs ranging in wavelengths from 340 nm to 940 nm, and 3) the Longwave Calibration Sensor (LCS), a four-channel thermal radiometer that measures scene temperatures between <100K and 400K. Currently a flight unit is being built for flight on Astrobotic’s maiden flight (Mission 1) to Lacos Mortis in July 2021. NIRVSS is also part of the Volatiles Investigating Polar Exploration Rover (VIPER) payload suite, making measurements while roving and of subsurface drill cuttings. -------------------- |
|
|
Nov 24 2019, 07:10 PM
Post
#5
|
|
Member Group: Members Posts: 292 Joined: 29-December 05 From: Ottawa, ON Member No.: 624 |
|
|
|
Nov 27 2019, 02:26 AM
Post
#6
|
|
Member Group: Members Posts: 866 Joined: 15-March 05 From: Santa Cruz, CA Member No.: 196 |
looks like the whole pallet lander design concept might be taking off (er 'landing') as part of the Artemis CLPS push, PDF
|
|
|
Jun 17 2020, 09:31 PM
Post
#7
|
|
Member Group: Members Posts: 311 Joined: 31-August 05 From: Florida & Texas, USA Member No.: 482 |
looks like the whole pallet lander design concept might be taking off (er 'landing') as part of the Artemis CLPS push, PDF https://spacenews.com/astrobotic-wins-nasa-...er-lunar-rover/ Astrobotic "will use its larger Griffin lander for VIPER, which weighs about 450 kilograms. The company, which will fly Peregrine on the first launch of United Launch Alliance’s Vulcan rocket in 2021, plans to select a launch provider for the VIPER mission later this year." |
|
|
Jul 9 2020, 12:09 AM
Post
#8
|
|
Solar System Cartographer Group: Members Posts: 10256 Joined: 5-April 05 From: Canada Member No.: 227 |
I was just watching Tony Colaprete presenting on VIPER at the NASA Exploration Science Forum. I had a chance to ask if images will be released in near-real time as we have for Mars (and this is over a c. 100 day mission as now envisaged). The answer is yes, there will be a feed releasing images to allow folks to follow the mission. Great news!
Phil -------------------- ... because the Solar System ain't gonna map itself.
Also to be found posting similar content on https://mastodon.social/@PhilStooke Maps for download (free PDF: https://upload.wikimedia.org/wikipedia/comm...Cartography.pdf NOTE: everything created by me which I post on UMSF is considered to be in the public domain (NOT CC, public domain) |
|
|
Jul 19 2022, 06:26 AM
Post
#9
|
|
Senior Member Group: Members Posts: 2547 Joined: 13-September 05 Member No.: 497 |
VIPER now delayed until November 2024 https://www.nasa.gov/feature/nasa-replans-c...-to-reduce-risk
QUOTE To complete the additional NASA-mandated tests of the Griffin lunar lander, an additional $67.8 million has been added to Astrobotic’s CLPS contract, which now totals $320.4 million. -------------------- Disclaimer: This post is based on public information only. Any opinions are my own.
|
|
|
Apr 3 2024, 06:37 PM
Post
#10
|
|
Senior Member Group: Members Posts: 1453 Joined: 26-July 08 Member No.: 4270 |
Progress on VIPER. The mast has been installed.
https://www.nasa.gov/general/nasa-viper-rob...ts-mighty-mast/ -------------------- -- Hungry4info (Sirius_Alpha)
|
|
|
Apr 4 2024, 11:25 PM
Post
#11
|
|
Solar System Cartographer Group: Members Posts: 10256 Joined: 5-April 05 From: Canada Member No.: 227 |
I have been posting maps of lunar landing sites on Mastodon. Here is the newest, for VIPER:
https://mastodon.social/@PhilStooke/112215513847135110 You might enjoy looking back through the entire set, chronologically for every lander since Luna 9 and now looking a bit ahead. Most of this material was originally posted here anyway but a few are new. Phil -------------------- ... because the Solar System ain't gonna map itself.
Also to be found posting similar content on https://mastodon.social/@PhilStooke Maps for download (free PDF: https://upload.wikimedia.org/wikipedia/comm...Cartography.pdf NOTE: everything created by me which I post on UMSF is considered to be in the public domain (NOT CC, public domain) |
|
|
Apr 10 2024, 07:23 AM
Post
#12
|
|
Solar System Cartographer Group: Members Posts: 10256 Joined: 5-April 05 From: Canada Member No.: 227 |
We don't really know yet what will happen to VIPER, but I expect its launch will be delayed in the wake of the failure of Astrobotic's first flight. However, we do know more about the first flight of the Griffin lander. Whether or not it carries VIPER, it will be carrying a cuberover built by Astrobotic. I think this was the same one that was to be carried to the Moon by the Masten lander before they went bankrupt (and got purchased by Astrobotic). At that time it was called Moonranger. Moonranger was a CLPS project as well.
https://www.astrobotic.com/spacefarer-cuber...n-on-griffin-1/ Phil -------------------- ... because the Solar System ain't gonna map itself.
Also to be found posting similar content on https://mastodon.social/@PhilStooke Maps for download (free PDF: https://upload.wikimedia.org/wikipedia/comm...Cartography.pdf NOTE: everything created by me which I post on UMSF is considered to be in the public domain (NOT CC, public domain) |
|
|
Jul 17 2024, 08:24 PM
Post
#13
|
|
Senior Member Group: Members Posts: 2113 Joined: 13-February 10 From: Ontario Member No.: 5221 |
Cancelled due to budget limitations
QUOTE Astrobotic will continue its Griffin Mission One within its contract with NASA, working toward a launch scheduled for no earlier than fall 2025. The landing without VIPER will provide a flight demonstration of the Griffin lander and its engines. NASA will pursue alternative methods to accomplish many of VIPER’s goals and verify the presence of ice at the lunar South Pole. A future CLPS delivery – the Polar Resources Ice Mining Experiment-1 (PRIME-1) — scheduled to land at the South Pole during the fourth quarter of 2024, will search for water ice and carry out a resource utilization demonstration using a drill and mass spectrometer to measure the volatile content of subsurface materials. |
|
|
Jul 17 2024, 09:53 PM
Post
#14
|
|
Member Group: Members Posts: 718 Joined: 22-April 05 Member No.: 351 |
Disappointing. Not surprising -------------------- |
|
|
Jul 18 2024, 08:33 AM
Post
#15
|
|
Member Group: Members Posts: 127 Joined: 3-September 12 From: Almeria, SE Spain Member No.: 6632 |
A little background about VIPER in this TwiX thread by Phil Metzger.
https://x.com/DrPhiltill/status/1813749041295184043 Thorsten |
|
|
Lo-Fi Version | Time is now: 31st October 2024 - 11:34 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |