IPB

Welcome Guest ( Log In | Register )

VEX Science Planning
cndwrld
post Mar 9 2007, 02:16 PM
Post #1


Member
***

Group: Members
Posts: 247
Joined: 17-February 07
From: ESAC, cerca Madrid, Spain.
Member No.: 1743



Hello-

I wasn't sure how most people would like to see stuff posted. Or if this would interest many people. But in the interests of putting out more information, I created this topic as a place to put information on Venus Express science planning.

If you have any ideas about this, let me know.

Cheers-

Don Merritt


--------------------
--
cndwrld@yahoo.com
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
cndwrld
post Apr 4 2007, 07:56 AM
Post #2


Member
***

Group: Members
Posts: 247
Joined: 17-February 07
From: ESAC, cerca Madrid, Spain.
Member No.: 1743



Venus Express Status, 25 March - 31 March

At the end of the last CEB pass in the reporting period (DOY 090, 18:00z) Venus Express was orbiting Venus at 183 million km from the Earth. The one-way signal travel time was 610 sec.

Mechanical and electrical systems continue to work without problems. We've got plenty of fuel, more than enough to take us through the recently approved Extended Mission until mid-2009. Batteries are fine.

The testing of operations during quadrature is on-going; the next quadrature phase will start in May 2007.

On 28/03/07, a proficiency test with the DSN Madrid 70-meter antenna (DSS-63) was held. This was in preparation for the five days of operations that will be used to take movies of the south pole region using the VIRTIS imaging spectrometer. VIRTIS movie passes are scheduled for the second week of April.

MTP014 (06 May - 03 June 2007) science pointing and command files have been accepted by the flight control team and flight dynamics team at ESOC, Darmstadt, Germany. MTP015 (04 June - 30 June) pointing files have been accepted; waiting to hear about the instrument command file processing.

MTP016 science planning has begun, with the spacecraft pointing files being worked on this week. This will include use of a recently approved pointing profile called 'pendulum pointing'. With our current thermal constraints, we have to follow pre-approved illumination profiles for each face of the spacecraft, each with a defined cooling period afterwards. If the spacecraft illumination from a desired pointing is not covered by a profile, the pointing is not allowed. If it is allowed, mandatory periods must be afterwards in a cooling attitude. These rules effectively forbid VEX from pointing to nadir when the Sun was directly behind the spacecraft; the +Z face has the instrument apertures, so pointing to nadir in such a situation exposed the -Z face for much longer periods than was allowed. The manufacturer, Astrium, has approved a profile that will allow us to look for about 24 minutes with reasonably high -Z exposure angles, then turn to a cooling attitude for similar periods. We will be able to get images now with the Sun at high angles while we are in the ascending arc of our orbit.

As with any device, whether spacecraft or new car, time is slowly taking its toll on VEX. The occasionaly spurious alarm or anomalous piece of telemetry; occasional minor malfunctions for no clear reason. Cosmic ray events that have to be separated from possible real problems. At this point, nothing unexpected, and enough so that checking it all out keeps the teams busy. In general, the thing is performing like a champ.

The last few months of science operations have included refinement of data modeling. In the fall of 2006, our technical support people put together a very nice system to allow the science operations engineers to see how much science data was returned by each instrument, and compare that with what was predicted. Given the margins that engineers put into everything when doing something for the first time, and the science teams not having lots of time to work on their models due to the rush to get ready for launch and operations, the predicted amounts were probably 25% higher than the actual received data. The good news is that it was too high, not too low, which would have caused us to lose data. But we were, in effect, "losing data" by not taking data for which we had capacity. The science engineers have worked with the instrument teams over the past six months, and the data predictions are becoming much better. This process will continue over the coming months. We are now beginning to review MTP011 results; MTP012 finished this week, and we have begun looking at the first week's results. We'll continue to refine the models to squeeze out every bit we can, to maximize the possible science return.

Cheers-

Don


--------------------
--
cndwrld@yahoo.com
Go to the top of the page
 
+Quote Post

Posts in this topic
- cndwrld   VEX Science Planning   Mar 9 2007, 02:16 PM
- - cndwrld   Science Planning Overview The VEX science plannin...   Mar 9 2007, 02:53 PM
- - ngunn   Excellent. I'll be following with great intere...   Mar 9 2007, 02:54 PM
- - cndwrld   MTP012 Science Plan The time span of the MTP012 o...   Mar 9 2007, 03:08 PM
- - cndwrld   Venus Express Support Of NASA's Messenger Spac...   Mar 15 2007, 09:29 AM
- - Stu   Thanks for sharing all this info with us Don, it...   Mar 15 2007, 10:03 AM
- - cndwrld   No problem, Stu. I'll toss out there whatever ...   Mar 15 2007, 11:25 AM
|- - Stu   QUOTE (cndwrld @ Mar 15 2007, 11:25 AM) I...   Mar 15 2007, 11:35 AM
- - centsworth_II   Even though the details are mostly over my head, I...   Mar 15 2007, 02:47 PM
- - dvandorn   Don, does the science team there *really* believe ...   Mar 15 2007, 03:13 PM
- - cndwrld   I think an awful lot of people are interested in t...   Mar 15 2007, 04:22 PM
|- - centsworth_II   QUOTE (cndwrld @ Mar 15 2007, 12:22 PM) ....   Mar 15 2007, 05:23 PM
|- - 4th rock from the sun   QUOTE (cndwrld @ Mar 15 2007, 04:22 PM) I...   Mar 15 2007, 05:30 PM
- - dvandorn   It's quite interesting to me, Don. I know I c...   Mar 15 2007, 05:31 PM
- - helvick   QUOTE I just don't know how many people are in...   Mar 15 2007, 06:36 PM
- - Rakhir   I appreciate reading these kind of details from th...   Mar 15 2007, 09:21 PM
- - ngunn   It's probably true to say that for every post ...   Mar 16 2007, 10:11 AM
- - cndwrld   VEX Weekly Status At the end of the last Cebreros...   Mar 20 2007, 03:52 PM
- - cndwrld   VEX Science Operations and Planning, 17 - 24 March...   Mar 30 2007, 01:05 PM
- - elakdawalla   Huh. Thanks for the information and heads up on p...   Mar 30 2007, 02:49 PM
- - cndwrld   VEX Virtis Cloud Images At the ESA web site, http...   Apr 3 2007, 03:36 PM
- - cndwrld   Venus Express Status, 25 March - 31 March At the ...   Apr 4 2007, 07:56 AM
- - cndwrld   VEX Planning and Status on 26 April 2007 I haven...   Apr 26 2007, 08:42 AM
- - helvick   Excellent updates Don, much appreciated. This deta...   Apr 26 2007, 10:22 AM
- - cndwrld   >> Is this an unusual approach to a problem ...   Apr 26 2007, 03:54 PM
- - edstrick   Back in the days of chipped flints and ... Early M...   Apr 28 2007, 07:15 AM


Reply to this topicStart new topic

 



RSS Lo-Fi Version Time is now: 23rd April 2024 - 05:10 PM
RULES AND GUIDELINES
Please read the Forum Rules and Guidelines before posting.

IMAGE COPYRIGHT
Images posted on UnmannedSpaceflight.com may be copyrighted. Do not reproduce without permission. Read here for further information on space images and copyright.

OPINIONS AND MODERATION
Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators.
SUPPORT THE FORUM
Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member.