Planned Network Upgrades, Possible downtime on March 31 \ April 1 |
![]() ![]() |
Planned Network Upgrades, Possible downtime on March 31 \ April 1 |
![]()
Post
#1
|
|
![]() Dublin Correspondent ![]() ![]() ![]() ![]() Group: Admin Posts: 1799 Joined: 28-March 05 From: Celbridge, Ireland Member No.: 220 ![]() |
UMSF may be inaccessible between 11:00PM PST on Saturday March 31st and 3:00AM PST on Sunday April 1st ( 6:00 AM to 10:00 AM UTC Sunday April 1st).
This is as a result of network infrastructure upgrades being carried out by our server hosting provider. |
|
|
![]() ![]() |
![]() |
Lo-Fi Version | Time is now: 10th December 2019 - 11:30 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is a project of the Planetary Society and is funded by donations from visitors and members. Help keep this forum up and running by contributing here. |
![]() |