MAVEN development to orbit insertion |
MAVEN development to orbit insertion |
Jul 30 2012, 02:31 PM
Post
#1
|
|
Junior Member Group: Members Posts: 60 Joined: 22-October 04 Member No.: 102 |
Not sure if this has been touched on before, I did not see a place for the MAVEN mission on the Past or Future missions subsection.
1)Will MAVEN have the ability to relay communication from the surface vehicles to Earth? 2)Am I correct in reading there are no visual cameras on MAVEN? Fair Use. http://lasp.colorado.edu/home/maven/scienc...rument-package/ The Particles and Fields Package, built by the University of California, Berkeley/Space Sciences Laboratory (SSL) with support from the University of Colorado Boulder/Laboratory for Atmospheric and Space Physics (LASP) and Goddard Space Flight Center (GSFC), contains six instruments that will characterize the solar wind and the ionosphere of the planet: •Solar Wind Electron Analyzer (SWEA) •Solar Wind Ion Analyzer (SWIA) •Suprathermal and Thermal Ion Composition (STATIC) •Solar Energetic Particle (SEP) •Langmuir Probe and Waves (LPW) •Magnetometer (MAG) The Remote Sensing Package, built by LASP, will determine global characteristics of the upper atmosphere and ionosphere via remote sensing. •Imaging Ultraviolet Spectrometer (IUVS) The Neutral Gas and Ion Mass Spectrometer (NGIMS), provided by GFSC, will measure the composition and isotopes of neutral ions. Apologies in advance if this has already been answered. (btw I think we do need a MAVEN sticky in future missions) John (Mars) |
|
|
Nov 18 2013, 07:22 PM
Post
#2
|
|
Senior Member Group: Members Posts: 2091 Joined: 13-February 10 From: Ontario Member No.: 5221 |
Spacecraft separation. Mars, here we come!
|
|
|
Nov 18 2013, 10:53 PM
Post
#3
|
|
Member Group: Members Posts: 154 Joined: 21-April 05 From: Rochester, New York, USA Member No.: 336 |
And now we wait...
|
|
|
Nov 19 2013, 12:41 PM
Post
#4
|
|
Member Group: Members Posts: 153 Joined: 4-May 11 From: Pardubice, CZ Member No.: 5979 |
And now we wait... Not really ... they will communicate (nice DSN visualisation ) And other activities will also happen: - Two to three weeks after launch, most of MAVEN’s instruments will power up for the first time and perform a post-launch checkout. - The 6 instruments in MAVEN's Particles and Fields (P&F) Package will remain powered on and will collect data during the cruise to Mars. - During the MAVEN cruise phase, flight operators will execute at least four trajectory correction maneuvers (TCMs). |
|
|
Lo-Fi Version | Time is now: 16th June 2024 - 02:03 PM |
RULES AND GUIDELINES Please read the Forum Rules and Guidelines before posting. IMAGE COPYRIGHT |
OPINIONS AND MODERATION Opinions expressed on UnmannedSpaceflight.com are those of the individual posters and do not necessarily reflect the opinions of UnmannedSpaceflight.com or The Planetary Society. The all-volunteer UnmannedSpaceflight.com moderation team is wholly independent of The Planetary Society. The Planetary Society has no influence over decisions made by the UnmannedSpaceflight.com moderators. |
SUPPORT THE FORUM Unmannedspaceflight.com is funded by the Planetary Society. Please consider supporting our work and many other projects by donating to the Society or becoming a member. |